Application of JIT on Materials and Labor Management of Construction Site
Abstract
Based on the above, the aim of this project is to understand the effectiveness of implementing the JIT production system in the construction sector. The survey method has been implemented to find the site base result. The main hypothesis of this project is, there is a positive relation between JIT and improved construction project efficiency. Research, surveys, and questionnaires were used to assess the independent and dependent variables. Sample of 100 managers, engineers, laborers, and planners in the field was randomly reached and researched. Samples and questionnaires were answered and prepared. The effects of the Just In Time production system in construction were tested using statistical tests including the chi-square test for the presence or absence of a positive relationship. The results of the studies show that there is a significant relation between skills and proficiency and the overall JIT concept for reaching the goal of a more efficient construction site and pattern.


